top of page
PortOfBelleduneMS (12 of 47).jpg

MODULAR
FABRICATION FACILITY

TERMINAL 4

TERMINAL 3

Marine Terminal Links

Competitively located adjacent to an ice-free, deep water port with heavy lift capacity

Our modular fabrication facility brings unlimited possibilities for fabrication, metal working, assembly, storage, and more.

gebBg.jpg

ACCESS TO RAIL AND TRANS-CANADA HIGHWAY

Strategically located to easily access raw materials

STATE-OF-THE-ART FABRICATION FACILITY

Unlimited possibilities for fabrication, metal working, assembly, storage, and more

EASY ACCESS TO INTERNATIONAL WATERS

Among the shortest routes to Europe, the Great Lakes and Canada’s Arctic

STRATEGICALLY LOCATED ON ARCTIC SHIPPING GATEWAY

The most flexible choice for moving project cargo into the Eastern Arctic as well as Newfoundland and Labrador

5800 sq.metres

(62,400 SQ.FT) OUTDOOR STORAGE/LAYDOWN AREA, WITH MUCH ROOM FOR EXPANSION

2

OVERHEAD CRANES WITH 20 TONNE LIFT CAPACITY EACH

24
HOUR ACCESS

24
HOUR ACCESS5%
GRADE FROM SITE TO MARINE TERMINALS

HIGHWAY

Intermodal Connectivity

Facility Specifications

bottom of page