TERMINAL 2

Equipped for efficient unloading

Built in 1991 to serve the NB Power 450 megawatt generating station, which is situated adjacent to the port, Terminal II is capable of handling Capesize vessels up to a 100,000 DWT maximum. Its automated coal continuous ship unloader (CSU) has the rated capacity of moving 1,750 metric tonnes per hour into its enclosed conveyor system.

Berth

Length

307 m / 1,007.2 ft

Depth (at chart datum)

14.3 m / 46.9 ft

Equipment

Automated continuous ship unloader (CSU)

Cargoes

Liquid Bulk

Dry Bulk

Principal Commodities

Coal

Petroleum Coke

Liquid Petroleum

Ocean

VESSEL INFO

Vessel Type

Capesize

Deadweight Tons

Up to 100,000