Terminal 3
(M.D. Young Terminal)
This state-of-the-art facility was built in 1998 specifically to serve the growing needs of shipping companies. The terminal and all of its infrastructure and equipment are in exceptional condition and are in operation year-round. The terminal offers flexible services and exceptional, rapid cargo handling, all of which make it a sound economical choice.
Length | Depth (at chart datum) |
455 m / 1,492.8 ft | 11.3 m / 37.1 ft |
Mobile conveyor belts, mobile harbour cranes, lift truck, all equipment related to bulk and general cargo